What should a building quotation include before you compare contractors in Cyprus?

Domicy.org · Published · Updated

Information checked on 22 October 2026

What should a building quotation include before you compare contractors in Cyprus?: illustrative image 1
Illustrative image, not a Domicy project.

A building quotation should identify the contractor, define exactly what is priced, explain what remains uncertain and set out the proposed payment and contract terms. Before comparing contractors in Cyprus, request the same scope, drawing revisions and specifications from everyone, then resolve exclusions and allowances in writing. Compare the clarified offers, not just their headline totals.

1. Give every contractor the same information

Before requesting prices, prepare one shared information pack. Ask every contractor to identify the documents used and list any assumptions made where information is missing.

Treasury guidance on tender documents identifies scope, deliverables, delivery time and contractual terms as essential information. Applying that framework to private quotations is a practical recommendation, not a statement that homeowners must use a public procurement format.

Ask each quotation to show:

  • Project address and a clear description of the works.
  • Quotation date, reference and validity period.
  • Drawing numbers, revision dates and specification references.
  • Itemised work descriptions and clearly marked alternatives.
  • Inclusions, exclusions and assumptions.
  • Proposed delivery arrangements and contractual terms.

If you change the brief, send the revision to everyone. Request a revised quotation rather than trying to compare offers based on different instructions.

2. Identify the contractor and check licensing

The Republic’s contractor guidance requires registration and an annual licence for practising the building and civil engineering contractor profession, and describes project classifications.

Request the contractor’s full legal name, registration number and current licence details with the quotation. Confirm that the entity offering to enter the contract, and its licence, cover your project rather than relying on a trading name.

The Contractors Council’s guidance says its directory can be searched by category, annual licence and district. It also describes a separate notification procedure for qualifying contractors established in another EU member state.

Authority confirmation: refer unfamiliar licensing arrangements to the Council. Do not assume that one document establishes authorisation for every project.

3. Define the work and the specification

Ask for enough detail to understand what will be supplied and installed. Replace phrases such as “good quality finishes” with named products or measurable requirements.

Treasury technical-specification guidance covers material characteristics, performance, dimensions, construction methods, testing and acceptance. The following checks adapt that guidance for homeowner use:

CheckWhat to request
Products and materialsNamed products or measurable specifications
QuantitiesQuantities and units where applicable, with the measurement basis
Supply and installationSeparate confirmation of whether both are included
WorkmanshipRelevant installation or construction requirements
AcceptanceHow compliance will be checked and by whom
SubstitutionsWho approves alternatives and their price consequences

Illustrative example: one quotation might cover supplying tiles only, while another covers supply and installation. Before comparing that package, ask both contractors to price the same specification, quantity and installation scope.

Make responsibilities and exclusions explicit

The Treasury tender-document guidance cited above includes subcontracting and the parties’ obligations among contract topics. Use a responsibility checklist to ask who supplies, installs, coordinates and pays for each package.

Request explicit treatment of:

  • Site setup, scaffolding and waste removal.
  • Protection of existing areas.
  • External works and utility connections.
  • Professional fees and permit-related costs.
  • Items supplied by you or installed by separate contractors.

This is an editorial checklist, not a claim that these items are normally included. Ask the contractor to mark each relevant item as included, excluded, allowed for or awaiting information.

For excluded work, identify who will arrange it and how it affects the contractor’s programme. Avoid treating a blank entry as confirmation that something is included.

4. Separate firm prices, measured work and allowances

ETEK’s introductory construction-contract material distinguishes arrangements with and without quantities and stresses clear responsibilities. It also discusses payment certification, completion and defects procedures. This is educational material, not confirmation of project-specific rights.

Request a breakdown that distinguishes:

  • Firm amounts: ask what scope and assumptions the stated amount covers.
  • Measured work: ask which quantities determine payment, who measures them and which rates apply.
  • Allowances: identify amounts included for work or selections that remain uncertain.

A provisional sum means an allowance for work not yet fully specified. Ask the contractor to define its scope and explain how the final charge will be calculated, including any additional charges.

Indicative estimates: label allowances separately from firm prices. Do not treat an allowance as a guaranteed final cost. If the quotations use different allowances, request a common comparison basis and keep unresolved amounts visible.

What should a building quotation include before you compare contractors in Cyprus?: illustrative image 2
Illustrative image, not a Domicy project.

5. Show VAT separately and confirm the assumptions

Request the net price, VAT rate or rates, VAT amount and total payable. Where different treatments are proposed, ask which work each applies to and what assumptions support that treatment.

Tax For All publishes instructions for requesting a reduced-rate VAT certificate for the purchase or construction of a primary residence. That application guidance does not establish your eligibility.

Professional or authority confirmation: establish the applicable VAT treatment with the Tax Department or a qualified tax adviser. A contractor’s quotation is not evidence that you qualify.

For comparison, keep the net price and stated VAT assumptions in separate columns. Do not choose an offer on the basis of an unconfirmed tax assumption.

6. Ask whether the quoted price can change

Request a clear statement about whether the price is fixed and which circumstances permit adjustments. Ask separately about the offer’s validity period and any adjustment provisions that would apply after contracting.

ETEK has discussed material-price adjustment formulas in private construction contracts. This historical guidance supports checking the clause, not predicting current material prices or adding an automatic escalation allowance.

Ask the contractor to explain in writing:

  • Which costs may change and what triggers an adjustment.
  • The calculation method and supporting evidence.
  • Who checks and approves the adjustment.
  • How the proposed change will be communicated.

Refer unclear clauses for project-specific professional review before accepting them.

7. Review payments, completion and defects

Using the ETEK educational material cited above as a framework, request the deposit, payment stages and evidence required before each payment. Ask who will check progress and confirm the amount due.

TopicClarification to request
DepositAmount, purpose and conditions
Interim paymentsStages or assessment method, plus supporting evidence
CompletionCriteria for recognising completed work
DefectsReporting, correction and verification arrangements
RetentionAmount held back and release conditions, if proposed

Retention means money held back under agreed conditions. If proposed, ask when it is released and who confirms those conditions have been met.

The supplied guidance establishes no universal deposit, retention percentage or defects period. Compare the proposed arrangements rather than assuming a particular percentage or period is standard.

8. Read the proposed contract alongside the quotation

The Cyprus Architects Association explains that MEDSK contracts address cost, time, quality and dispute procedures. Request the proposed contract form and amendments alongside the quotation, and have project-specific terms reviewed before acceptance.

Ask for the proposed programme, start conditions, completion obligations and procedure for variations, meaning changes to the agreed work. Request a written process for approving each change’s price and time effect.

Clarify who may instruct changes, what information must accompany a proposal and how approval is recorded. Ask how conflicting descriptions between the quotation, drawings, specifications and contract will be resolved.

Keep approval responsibilities separate from permission

Official building-permission guidance identifies the relevant District Local Government Organisation as the building-permit authority.

Record who handles applications, supporting documents and associated costs. Ask the contractor to identify any approval-dependent start conditions rather than presenting an unconditional start commitment.

Authority confirmation: the responsible professional and authority should confirm the requirements for your particular works. A quotation, parcel record or zoning description does not establish permission to build.

9. Compare clarified offers, not headline totals

Create one comparison sheet with a column for each contractor. Record the document revisions, priced scope, exclusions, allowances, VAT assumptions, adjustment clauses, payment stages and programme conditions.

Mark each item as confirmed, indicative or awaiting confirmation. These labels distinguish agreed information from estimates and unresolved questions.

Before ranking offers, check that:

  • Each contractor has priced the same current information.
  • Material and installation requirements are comparable.
  • Excluded work has an identified responsible party.
  • Allowances remain clearly labelled.
  • VAT and licensing questions have been referred for confirmation where needed.
  • Proposed contract terms have been reviewed.

Send each contractor a focused clarification list and request a revised quotation or written addendum. Keep that response with the offer it clarifies. Domicy provides independent homeowner guidance, not contractor, developer, agent or tax-adviser services.